현장타설말뚝 선단 슬라임 두께 측정

ystcha 2020. 10. 29. 16:31

영신컨설턴트 (02) 529 8803 ystcha@naver.com 2020 10

 

 

천공기 자중으로 관입하여 선단 슬라임 두께 측정

 

SQUID 최대하중 100MPa 최대변위 측정 16cm 선단면적 10cm2 3

 

 

Debris Layer Thickness

 

Debris suggested to be material with insufficient bearing capacity

 

SQUID tip is circle, 35 mm diameter

 

Terzaghi qu = 1.3 c Nc, suggested c=100 kPa Nc = 5.7

 

Threshold Force = qu * A plate

 

Top of debris threshold, suggested c=12.5 kPa

 

 

구성

Defining Debris 선단 슬라임 미국 규정

 

 

WV: No more than ½ inch depth of material on 75% of the bottom and the remaining 25% has no material more than 1-½ inches in thickness. Otherwise, the socket needs to be recleaned.

 

선단 슬라임 75%에서 12.7mm이하 25%에서 38mm 이하로 청소

GA: Remove sediment and debris from the bottom of the caissons. Do not place the reinforcing steel or concrete until the Engineer has approved.

OK: clean the hole so 50 percent of each hole bottom has less than ½ in [12 mm] of sediment. Ensure the remaining 50 percent of the hole has no greater than 1 ½ in [38 mm] of debris.

 

50%에서 슬라임 12mm 이하 50% 38mm 이하

 

 

 

3개의 콘에서 초기 0.02Kips - 0.16 Kips 이하를 슬라임 두께

 

공대공 초음파 시험 시 선단 슬라임으로 도달시간이 길고 에너지가 작다.

 

 

선단 청소 전 슬라임 SQUID

 

선단 청소 후 SQUID 슬라임 감소

 

 

 

(예제)

SQUID Qc 2MPa과 양방향 1.9 MPa 재하시험 비교

 

 

양방향 재하시험 선단 지지력 1.9 MPa

WVDOH Fulton Bridge - Wheeling, WV

 

Limestone bedrock

Specification : <0.5" over 70% of section <1.5" everywhere

 

 

선단 청소 트레미 관으로 하단에 물 주입하고 배수

 

sump (모으는 웅덩이) hole

 

 

청소 시간경과에 따른 3개 콘 값 슬라임 감소

 

3개 콘 값